5⃣ When to receive technical specifications? ⠀
⠀
With the exception of remote species plots with autonomous engineering systems, all other plots in partnerships, various cottage villages or on the lands of settlements, at least, are connected to power supply networks. In developed regions, it is also a centralized water supply with sewage, and even gas. Although the legislation provides for the shortest possible time, obtaining technical specifications for technological connection to existing engineering networks should be puzzled immediately after the acquisition of the site, in parallel with the design. So that by the time construction begins, you don’t have to negotiate with neighbors (which not everyone has and is not always adequate) or urgently seek funds for a generator. ⠀
⠀
6⃣ Is geology a must? ⠀
At first it’s better to find a designer, and already he will make up a task for geologists. Another option is statistical sounding, the data obtained by the designer for the calculations will be enough. ⠀
⠀
7⃣ What is included in the preparation for construction? ⠀
The proper organization of the process is as follows. ⠀
⠀
☑ Preparation of technical specifications (TOR) ⠀
☑ Design ⠀
☑ Preparation for construction ⠀
☑ Construction ⠀
⠀
8⃣ They say a building permit is no longer needed? ⠀
Moreover, within the framework of an extended summer cottage amnesty, not only permission is abolished, but also notification of the beginning and end of construction. True, we are talking only about residential or garden houses being erected on plots in garden associations, habitually referred to as country houses, although it is no longer country houses as forms. Simplification, according to which registration of rights and registration with the cadastral register is again carried out on the basis of the technical plan, is valid from August 4, 2019 to March 1, 2021. If you are sure that the construction is guaranteed to be completed during 2020, the maximum, in January 2021, you can not give notice of. ⠀